Civil Engineering Collection home page

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 1 to 20 of 1288
Issue DateTitleAuthor(s)
2026-03-06ANALISIS KECELAKAAN LALU LINTAS DENGAN MENGGUNAKAN METODE ANGKA EKIVALEN KECELAKAAN DAN METODE UPPER CONTROL LIMIT PADA JALAN SISINGAMANGARAJA MEDANAHMED, MUHAMMAD ALDINO
2026-04-18PENGARUH PENGUJIAN ABU SEKAM PADI DAN PENAMBAHAN SIKAFUME TERHADAP UJI KUAT TARIK BETON DAN PERENDAMANPratama, Budi Andika
2026-04-28ANALISIS PENGARUH SERBUK KACA DAN SUPERPLASTICIZER TERHADAP KUAT TARIK BELAH BETON (Studi Penelitian)DIKO, RIZKI RAMADDAN
2026-01-20ANALISIS SALURAN DRAINASE DI KAWASAN ALIRAN SUNGAI SERUWAI KELURAHAN INDRA KASIH, KECAMATAN MEDAN TEMBUNG, KOTA MEDAN (Studi Kasus)MUHAMMAD, WAHYUDI SILAEN
2026-01-30Analisis Perbandingan Percepatan Waktu Proyek Menggunakan Metode Fast track, Overlapping dan Metode Crashing Pada Pembangunan Gedung Kuliah Terpadu di Politeknik Perkapalan Negeri Surabaya (STUDI KASUS)Muhammad, Firza Pratama
2026-02-20ANALISIS PENGARUH VOLUME DAN KECEPATAN KENDARAAN TERHADAP TINGKAT KEBISINGAN PADA SIMPANG TIGA RAYA MARENDAL SISINGAMANGARAJA KECAMATAN MEDAN AMPLAS (STUDI KASUS)ROYKHAN, SHANRIZKI
2026-04-28PENGARUH PENGGUNAAN ADITIF SERBUK KACA PADA BETON NORMAL TERHADAP KUAT TEKAN BETON (Studi Penelitian)M.ALIF, RIZKIANSYAH HASIBUAN
2026-04-18ANALISIS KEMACETAN PADA RUAS JALAN RADEN SALEH KOTA MEDANRizki, Wahyuda
2026-04-18ANALISIS FAKTOR UTAMA RISIKO PENYEBAB KECELAKAAN PADA PENGGUNA JALAN MENGGUNAKAN METODE UPPER CONTROL LIMIT (Studi Kasus : Jalan Kapten Sumarsono Medan)MAHRUZAR, PRATAMA NST
2026-04-18ANALISIS MODEL TARIKAN PERGERAKAN MASYARAKAT KE KAWASAN PERDAGANGAN KOTA TEBING TINGGI (PASAR GAMBIR TEBING TINGGI) (Studi Kasus)April, Parada Pratama Daulay
2026-02-18ANALISA KERUSAKAN LAPIS PERMUKAAN DENGAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) (Studi Kasus)MUHAMMAD, NIZAR
2026-04-08ANALISIS PERBANDINGAN PELAKSANAAN STRUKTUR PLAT LANTAI DENGAN MENGGUNAKAN METODE KONVENSIONAL DAN METODE PRECAST FULL SLAB DARI SEGI WAKTU DAN BIAYA PADA PEMBANGUNAN RUMAH 3 LANTAI, DI CITRA LAND GAMA CITY SUMATERA UTARA.M. FITRAH, BAGUS SUHADA
2026-01-30ANALISIS HARGA SATUAN PEKERJAAN UNTUK PONDASI PADA REBUSAN VERTICAL PABRIK SAWIT PT. MUTIARA SAWIT SELUMA, PROVINSI BENGKULU, BERDASARKAN METODE AHSP SNI DAN BOWALIF, ALFAROZA
2026-04-17ANALISIS DAMPAK LALU LINTAS AKIBAT PEMBANGUNAN RSUD PANYABUNGAN KABUPATEN MANDAILING NATAL (Studi Kasus)YOGI, FIRANDA MARPAUNG
2026-03-02ANALISA PENINGKATAN PERKERASAN PADA RUAS JALAN SIMPANG RAYA–TIGARAS KABUPATEN SIMALUNGUN (Studi Kasus)FAHRIZA, MUHAMMAD AGUNG
2026-04-17EVALUASI PERKERASAN JALAN MENGGUNAKAN METODE IRI ( INTERNATIONAL ROUGHNES INDEX ) BERBASIS APLIKASI ROADROID JALAN LINTAS, LABUHAN BATU UTARARIKI, HAMID RITONGA
2026-04-17ANALISIS KESELAMATAN LALU LINTAS PADA JALAN PASAR BENGKEL KEC. PERBAUNGAN (STUDI KASUS)M. FATRA, ANGGANA
2025-09-13ANALISIS SIMPANG EMPAT DENGAN APILL PADA SIMPANG GAPERTA KOTA MEDAN (Studi Kasus)MUHAMMAD, ALDI TRIPUTRA
2025-09-13ANALISA DRAINASE SERTA PENGARUHNYA TERHADAP KERUSAKAN PADA JALAN ASPAL DI JALAN SISINGAMANGARAJA, TIMBANG DELI KEC. MEDAN AMPLAS, KOTA MEDAN (Studi Kasus)Nasrullah
2025-09-08ANALISIS EFEKTIVITAS ZONA SELAMAT SEKOLAH (ZoSS) DI YAYASAN PERGURUAN HARAPAN MANDIRI MEDAN JALAN BRIGJEND KATAMSO KOTA MEDANAHMAD, AULIA AKBAR
Collection's Items (Sorted by Submit Date in Descending order): 1 to 20 of 1288