Please use this identifier to cite or link to this item:
http://repository.umsu.ac.id/handle/123456789/16083| Title: | tudi Pembebasan Lahan Terhadap Aspek Biaya dan Aspek Waktu Pada Proyek Pembangunan Jalan Tol Trans Sumatera Binjai-Langsa Zona I STA(0+000)-(0+500) |
| Authors: | Maydella, Ismi Rizka |
| Keywords: | pembebasan lahan;rencana;realisasi;biaya;waktu |
| Issue Date: | 27-Sep-2021 |
| URI: | http://repository.umsu.ac.id/handle/123456789/16083 |
| Appears in Collections: | Civil Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| SKRIPSI ISMI RIZKA MAYDELLA.pdf | 3.06 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.