Research Repository
Search
Login
UMSU REPOSITORY
→
Students Paper
→
Faculty of Engineering
→
Search
JavaScript is disabled for your browser. Some features of this site may not work without it.
Search
Filters
Use filters to refine the search results.
Current Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
New Filters:
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Showing 10 out of a total of 19 results for community: Faculty of Engineering.
(0.005 seconds)
Now showing items 1-10 of 19
1
2
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Analisa Pengaruh Putaran Pully Terhadap Unjuk Kerja Mesin Pencacah Limbah Botol Plastik Dan Softdrink Kapasitas 10 Kg/Jam
Syahputra, Dian Pratama
(
2019-07
)
Kajian Nilai Waktu Mahasiswa Fakultas Pertanian Universitas Muhammadiyah Sumatera Utara
Darmawan, Ahlun
(
UMSU
,
2020-06-11
)
Perbandingan Biaya dan Waktu Pemakaian Alat Berat Bulldozer dan Excavator dengan Backhoe Loader Pada Pembangunan Bendung Daerah Irigasi Serdang
Suhendra, Deden
(
UMSU
,
2020-03-07
)
Kajian Nilai Waktu Mahasiswa Fakultas Teknik Universitas Muhammadiyah Sumatera Utara
Siregar, Chairuddin Ahmad
(
2020-06-20
)
ANALISIS PEMILIHAN MODA TRANSPORTASI PENUMPANG ANTARA BUS DAMRI, TAKSI ONLINE DAN KERETA API INDONESIA RUTE KUALANAMU-MEDAN
Ritonga, Budi Rizki
(
2022-11-24
)
ANALISA WAKTU DAN BIAYA PENGGUNAAN TOWER CRANE PADA PROYEK PEMBANGUNAN GEDUNG PARKIR MASJID AGUNG MEDAN (Studi Kasus)
NAINGGOLAN, DESI CHUINI
(
2022-11-10
)
ANALISIS PRODUKTIVITAS DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN TANAH PADA PROYEK JALAN TOL INDRAPURA-KISARAN (STUDI KASUS)
RAHMAN, MUHAMMAD ARIF
(
2022-12-02
)
Analisis Kebutuhan Air Domestik yang Prioritas pada Kawasan Permukiman di Ibu Kota Kecamatan (IKK) Kabupaten Serdang Bedagai
Wijaya, Febriani Aulia
(
2020-10
)
Evaluasi Kinerja Angkutan Umum Pedesaan dari Desa Stabat – Tandem
Batubara, Fachriza Maulana Azhari
(
2021-10-14
)
Analisis Faktor Utama Keberhasilan Proyek Konstruksi pada Proyek Pembangunan Rumah Sakit Regina Maris Kota Medan
Ramadhan, Fakhrul
(
2021-06-14
)
Now showing items 1-10 of 19
1
2
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Browse
All of DSpace
Communities & Collections
By Issue Date
Authors
Titles
Subjects
By Submit Date
This Community
By Issue Date
Authors
Titles
Subjects
By Submit Date
My Account
Login
Register
Discover
Author
Arif, Hazmy (1)
Batubara, Fachriza Maulana Azhari (1)
CAHYAN, SEPTIAN (1)
Darmawan, Ahlun (1)
Gunawan, Randi (1)
NAINGGOLAN, DESI CHUINI (1)
Prasetyo, Harry Rizky (1)
RAHMAN, MUHAMMAD ARIF (1)
Ramadani, Romi (1)
Ramadhan, Fakhrul (1)
... View More
Subject
Waktu (19)
Biaya (9)
Nilai waktu (3)
Uang (3)
Diameter Puli (2)
K3L (2)
Keberhasilan Proyek (2)
Mesin pencacah (2)
Mutu (2)
Produktifitas (2)
... View More
Date Issued
2022 (6)
2020 (5)
2021 (4)
2023 (3)
2019 (1)
Has File(s)
Yes (19)