Skip navigation
Home
Browse
Communities
& Collections
Browse Items by:
Issue Date
Author
Title
Subject
Submit Date
Help
Sign on to:
My DSpace
Receive email
updates
Edit Profile
DSpace
JSPUI
DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets
Learn More
Universitas Muhammadiyah Sumatera Utara
Search
Search:
All of DSpace
Students Paper
Faculty of Engineering
Civil Engineering
Electrical Engineering
Mechanical Engineering
for
Current filters:
Title
Author
Subject
Date Issued
Has File(s)
???jsp.search.filter.original_bundle_filenames???
???jsp.search.filter.original_bundle_descriptions???
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Start a new search
Add filters:
Use filters to refine the search results.
Title
Author
Subject
Date Issued
Has File(s)
???jsp.search.filter.original_bundle_filenames???
???jsp.search.filter.original_bundle_descriptions???
Equals
Contains
ID
Not Equals
Not Contains
Not ID
Results 1-10 of 19 (Search time: 0.0 seconds).
previous
1
2
next
Item hits:
Issue Date
Title
Author(s)
2019-07
Analisa Pengaruh Putaran Pully Terhadap Unjuk Kerja Mesin Pencacah Limbah Botol Plastik Dan Softdrink Kapasitas 10 Kg/Jam
Syahputra, Dian Pratama
2020-06-11
Kajian Nilai Waktu Mahasiswa Fakultas Pertanian Universitas Muhammadiyah Sumatera Utara
Darmawan, Ahlun
2020-03-07
Perbandingan Biaya dan Waktu Pemakaian Alat Berat Bulldozer dan Excavator dengan Backhoe Loader Pada Pembangunan Bendung Daerah Irigasi Serdang
Suhendra, Deden
2020-06-20
Kajian Nilai Waktu Mahasiswa Fakultas Teknik Universitas Muhammadiyah Sumatera Utara
Siregar, Chairuddin Ahmad
2022-11-24
ANALISIS PEMILIHAN MODA TRANSPORTASI PENUMPANG ANTARA BUS DAMRI, TAKSI ONLINE DAN KERETA API INDONESIA RUTE KUALANAMU-MEDAN
Ritonga, Budi Rizki
2022-11-10
ANALISA WAKTU DAN BIAYA PENGGUNAAN TOWER CRANE PADA PROYEK PEMBANGUNAN GEDUNG PARKIR MASJID AGUNG MEDAN (Studi Kasus)
NAINGGOLAN, DESI CHUINI
2022-12-02
ANALISIS PRODUKTIVITAS DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN TANAH PADA PROYEK JALAN TOL INDRAPURA-KISARAN (STUDI KASUS)
RAHMAN, MUHAMMAD ARIF
2020-10
Analisis Kebutuhan Air Domestik yang Prioritas pada Kawasan Permukiman di Ibu Kota Kecamatan (IKK) Kabupaten Serdang Bedagai
Wijaya, Febriani Aulia
2021-10-14
Evaluasi Kinerja Angkutan Umum Pedesaan dari Desa Stabat – Tandem
Batubara, Fachriza Maulana Azhari
2021-06-14
Analisis Faktor Utama Keberhasilan Proyek Konstruksi pada Proyek Pembangunan Rumah Sakit Regina Maris Kota Medan
Ramadhan, Fakhrul
Discover
Author
1
Arif, Hazmy
1
Batubara, Fachriza Maulana Azhari
1
CAHYAN, SEPTIAN
1
Darmawan, Ahlun
1
Gunawan, Randi
1
NAINGGOLAN, DESI CHUINI
1
Prasetyo, Harry Rizky
1
RAHMAN, MUHAMMAD ARIF
1
Ramadani, Romi
1
Ramadhan, Fakhrul
.
next >
Subject
9
Biaya
3
Nilai waktu
3
Uang
2
Diameter Puli
2
K3L
2
Keberhasilan Proyek
2
Mesin pencacah
2
Mutu
2
Produktifitas
2
Putaran Mesin dan Kapasitas
.
next >
Date issued
6
2022
5
2020
4
2021
3
2023
1
2019
Has File(s)
19
true